Simex TFV vertical drum cutter cropping reinforced concrete piles in Genoa construction site
Inside the huge infrastructural project that involves the road and railway traffic in the direction of the former Morandi bridge, a vertical drum cutter cropped more than 600 pile heads in order to expose the reinforcement bars, in preparation of the next phase of the works.